|
their planned or future | |
Vikrant, which cost around 200bn rupees ($2.5bn; £2.1bn), was expected to be inducted into the navy by 2017. But the second phase of its construction was beset by delays. | |
ผู้ตั้งกระทู้ their planned or future (metha2110-at-gmail-dot-com) :: วันที่ลงประกาศ 2022-09-01 18:08:51 |
Visitors : 675052 |